Share

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE PDF Online Free

Author :
Release : 2001
Genre :
Kind : eBook
Book Rating : /5 ( reviews)

GET EBOOK


Book Synopsis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE by :

Download or read book Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE written by . This book was released on 2001. Available in PDF, EPUB and Kindle. Book excerpt: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2).

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2). PDF Online Free

Author :
Release : 2003
Genre :
Kind : eBook
Book Rating : /5 ( reviews)

GET EBOOK


Book Synopsis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2). by :

Download or read book Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2). written by . This book was released on 2003. Available in PDF, EPUB and Kindle. Book excerpt: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS.

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS. PDF Online Free

Author :
Release : 2001
Genre :
Kind : eBook
Book Rating : /5 ( reviews)

GET EBOOK


Book Synopsis Supplement Analysis for the Transmission System Vegetation Management Program FEIS. by :

Download or read book Supplement Analysis for the Transmission System Vegetation Management Program FEIS. written by . This book was released on 2001. Available in PDF, EPUB and Kindle. Book excerpt: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attachment. BPA is clearing the danger trees to prevent them from falling or growing into the lines causing outages. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (EIS) and Record of Decision (ROD). The planning step are described in the attached checklist. This Supplement Analysis finds that (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD, and; (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line PDF Online Free

Author :
Release : 2003
Genre :
Kind : eBook
Book Rating : /5 ( reviews)

GET EBOOK


Book Synopsis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line by :

Download or read book Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line written by . This book was released on 2003. Available in PDF, EPUB and Kindle. Book excerpt: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. See Section 1 of the attached checklist for a complete description of the proposal.

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37).

Download Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37). PDF Online Free

Author :
Release : 2002
Genre :
Kind : eBook
Book Rating : /5 ( reviews)

GET EBOOK


Book Synopsis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37). by :

Download or read book Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37). written by . This book was released on 2002. Available in PDF, EPUB and Kindle. Book excerpt: Vegetation Management along the Monroe-Custer No. 1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No. 2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor.

You may also like...